River Island North/South Restoration
Barton, OR

Client: Inter-fluve/Metro Clackamas, OR

 

Point Environmental was contracted by Inter-Fluve to provide erosion and sediment control designs and permitting for the River Island North and South Restoration Projects. 

 

The River Island Projects provided a series of fish habitat enhancement measures to increase the quantity and quality of fish habitat along the Clackamas River. These included removal of historically placed fills, old roadbeds, gravel mine tailings, excavation stream channel and backwater areas, and placement of large woody debris habitat structures within regulated in-water work areas. 

 

Point Environmental provided erosion and sediment control and 1200-C permitting for the project design package.